{"id":510,"date":"2014-10-29T01:41:34","date_gmt":"2014-10-29T01:41:34","guid":{"rendered":"http:\/\/jondieges.com\/?page_id=510"},"modified":"2014-12-16T15:01:54","modified_gmt":"2014-12-16T15:01:54","slug":"welcome-to-the-gallery-of-architectural-work-public-buildings-by-jon-dieges-architect","status":"publish","type":"page","link":"https:\/\/jondieges.com\/?page_id=510","title":{"rendered":"Welcome to the Gallery of Architectural Work&#8211;Public Buildings&#8211;by Jon Dieges, Architect"},"content":{"rendered":"<p>Ojai Valley Foursquare Church completed 1984:<\/p>\n<figure id=\"attachment_1571\" aria-describedby=\"caption-attachment-1571\" style=\"width: 474px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotos4SQmodelLOOKINGsouthwest19820001.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-1571\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotos4SQmodelLOOKINGsouthwest19820001.jpg?resize=474%2C158\" alt=\"The study model I built of the final design for approval by the Ojai Valley Foursquare Church congregation and leadership in 1982--the construction took place from Summer of 1983 until the Spring of 1984, but the official dedication did not take place until 1986 even though it was being used--a couple of years after completion and occupancy this 10,000 square foot, million dollar project was paid off.\" width=\"474\" height=\"158\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotos4SQmodelLOOKINGsouthwest19820001.jpg?resize=300%2C100&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotos4SQmodelLOOKINGsouthwest19820001.jpg?resize=1024%2C341&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotos4SQmodelLOOKINGsouthwest19820001.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotos4SQmodelLOOKINGsouthwest19820001.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-1571\" class=\"wp-caption-text\">The study model I built of the final design for approval by the Ojai Valley Foursquare Church congregation and leadership in 1982&#8211;the construction took place from Summer of 1983 until the Spring of 1984, but the official dedication did not take place until 1986, even though it was being used&#8211;a couple of years after completion and occupancy this 10,000 square foot, million dollar project was paid off&#8211;SEE FURTHER BELOW.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Additions to Help of Ojai Senior Center &#8220;Little House&#8221; next to the Ojai City Hall, completed 1990:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/021.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-551\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/021.jpg?resize=474%2C356\" alt=\"Front and Back Additions to the &quot;Little House&quot; Help of Ojai Senior Center next to the ojai City Hall--a semi-Pro-Bono effort working closely with their Building Committee--Ed paulson, Help of ojai president at the time, Marlene Spencer, HDirector at the time, and J. Wesley Kent, full-time volunteer in honor of whom the rear Meeting Hall was named.\" width=\"474\" height=\"356\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/021.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/021.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/021.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/021.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>Front and Back Additions to the &#8220;Little House&#8221; Help of Ojai Senior Center next to the ojai City Hall&#8211;a semi-Pro-Bono effort working closely with their Building Committee&#8211;Ed paulson, Help of Ojai president at the time, Marlene Spencer, Executive Director at the time, and J. Wesley Kent, full-time volunteer, in honor of whom the rear Meeting Hall was named.<\/p>\n<p>&nbsp;<\/p>\n<p>The Ojai Raptor Center, completed 2011:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/011.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-85\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/011.jpg?resize=473%2C355\" alt=\"Just completed Eagle Flight Rehabilitation Aviary  in which recovering Golden and Blad Eagles can learn to make both right hand and left hand turns in the giant 100 foot x 100 foot &quot;Ell&quot; shaped structure--at the March 10, 2010, Ojai Raptor Center Open House.\" width=\"473\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/011.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/011.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/011.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/011.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 473px) 100vw, 473px\" \/><\/a><\/p>\n<p>Just completed Eagle Flight Rehabilitation Aviary in which recovering Golden and Blad Eagles can learn to make both right hand and left hand turns in the giant 100 foot x 100 foot &#8220;Ell&#8221; shaped structure&#8211;at the March 10, 2010, Ojai Raptor Center Open House.<\/p>\n<figure id=\"attachment_204\" aria-describedby=\"caption-attachment-204\" style=\"width: 473px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/009.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-204\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/009.jpg?resize=473%2C355\" alt=\"View of giant Eagle Aviary looking Northwest.\" width=\"473\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/009.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/009.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/009.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/009.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 473px) 100vw, 473px\" \/><\/a><figcaption id=\"caption-attachment-204\" class=\"wp-caption-text\">View of giant Eagle Aviary looking Northwest.<\/figcaption><\/figure>\n<figure id=\"attachment_84\" aria-describedby=\"caption-attachment-84\" style=\"width: 480px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/008.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-84\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/008.jpg?resize=474%2C356\" alt=\"Edison put up some money for this worthwhile project becaue many Birds of Prey get electrocuted.\" width=\"474\" height=\"356\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/008.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/008.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/008.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/008.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-84\" class=\"wp-caption-text\">Edison put up some money for this worthwhile project because many Birds of Prey get electrocuted.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>The Ojai Retreat Remodeling 2005 to 2010 at 160 Besant Road:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/The-OJAI-RETREAT-Aerial-View-Buildings.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-214\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/The-OJAI-RETREAT-Aerial-View-Buildings.jpg?resize=474%2C270\" alt=\"Aerial View of five buildings totalling about 6000 square feet on five acres that comprise the Ojai Retreat that was extensively remodeled 2005-2008 with a new wheelchair accessible public restroom and three new seepage pits added in 2010 when the CUP was renewed foranother ten years.\" width=\"474\" height=\"270\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/The-OJAI-RETREAT-Aerial-View-Buildings.jpg?resize=300%2C171&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/The-OJAI-RETREAT-Aerial-View-Buildings.jpg?resize=1024%2C586&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/The-OJAI-RETREAT-Aerial-View-Buildings.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/The-OJAI-RETREAT-Aerial-View-Buildings.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>Aerial View of five buildings totalling about 6000 square feet on five acres that comprise the Ojai Retreat that was extensively remodeled 2005-2008 with a new wheelchair accessible public restroom in the Main Building and three new seepage pits added in 2010 when the CUP was renewed for another ten years.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_210\" aria-describedby=\"caption-attachment-210\" style=\"width: 471px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/123_2319.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-210\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/123_2319.jpg?resize=471%2C353\" alt=\"Jim Felix Electrical did the installation of a whole new Electrical Meter Panel and Load Center coming from an Edison pole at the west end of the Ojai Retreat Property--trenching by Larry Harrold--this panel for Cottages C and D relieved the load on the main 400 Amp Service served by Edison coming from the east end of the property.\" width=\"471\" height=\"353\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/123_2319.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/123_2319.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/123_2319.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/123_2319.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/123_2319.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a><figcaption id=\"caption-attachment-210\" class=\"wp-caption-text\">Jim Felix Electrical did the installation of a whole new Electrical Meter Panel and Load Center coming from an Edison pole at the west end of the Ojai Retreat Property&#8211;trenching by Larry Harrold&#8211;this panel for Cottages C and D relieved the load on the main 400 Amp Service served by Edison coming from the east end of the property.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_218\" aria-describedby=\"caption-attachment-218\" style=\"width: 471px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/129_2956.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-218\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/129_2956.jpg?resize=471%2C353\" alt=\"The complex Distribution box for the Common Leach Line field for Cottages C and D at the west end of the Ojai Retreat--Larry Harrold did the trenching and installation for the complete system.\" width=\"471\" height=\"353\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/129_2956.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/129_2956.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/129_2956.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/129_2956.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/129_2956.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a><figcaption id=\"caption-attachment-218\" class=\"wp-caption-text\">The complex Distribution box for the Common Leach Line field for Cottages C and D at the west end of the Ojai Retreat&#8211;Larry Harrold did the trenching and installation for the complete system.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_217\" aria-describedby=\"caption-attachment-217\" style=\"width: 469px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Canon-EOS-Rebel-Xsi-First-Photos-06-28-2009-023.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-217\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Canon-EOS-Rebel-Xsi-First-Photos-06-28-2009-023.jpg?resize=469%2C352\" alt=\"The Two new tanks and three new pumps were installed by Coast Pump, led by Bill Hughes--a tricky operation lifting the tanks through the trees.\" width=\"469\" height=\"352\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Canon-EOS-Rebel-Xsi-First-Photos-06-28-2009-023.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Canon-EOS-Rebel-Xsi-First-Photos-06-28-2009-023.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Canon-EOS-Rebel-Xsi-First-Photos-06-28-2009-023.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Canon-EOS-Rebel-Xsi-First-Photos-06-28-2009-023.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 469px) 100vw, 469px\" \/><\/a><figcaption id=\"caption-attachment-217\" class=\"wp-caption-text\">The two new tanks and three new pumps were installed by Coast Pump, led by Bill Hughes&#8211;a tricky operation lifting the tanks through the trees.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_219\" aria-describedby=\"caption-attachment-219\" style=\"width: 476px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/022.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-219\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/022.jpg?resize=474%2C356\" alt=\"Part of the remodeling of the Ojai Retreat was the $70,000 upgrading of the water system at the top of a hill with new state-of-the-art tanks and pumps and fire reserve hydrant and line.\" width=\"474\" height=\"356\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/022.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/022.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/022.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/022.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-219\" class=\"wp-caption-text\">Part of the remodeling of the Ojai Retreat was the $70,000 upgrading of the water system at the top of a hill with new state-of-the-art tanks and pumps and fire reserve hydrant and line.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_216\" aria-describedby=\"caption-attachment-216\" style=\"width: 477px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_1127.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-216\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_1127.jpg?resize=474%2C356\" alt=\"Damon Webb Construction id a masterful job remodeling ofCottage C and the Main Building under the watchful eye of Jon Dieges, the Architect for the remodeling program.\" width=\"474\" height=\"356\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_1127.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_1127.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_1127.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_1127.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-216\" class=\"wp-caption-text\">Damon Webb Construction did a masterful job on the remodeling of Cottage C and the Main Building under the watchful eye of Jon Dieges, the Architect for the remodeling program.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_211\" aria-describedby=\"caption-attachment-211\" style=\"width: 472px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0941.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-211\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0941.jpg?resize=472%2C629\" alt=\"The Top of the new  Main Switchboard relacing the 1940's era electrical panel--Powerbright Electric led by Luis Munoz did the installation\/upgrade.\" width=\"472\" height=\"629\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0941.jpg?resize=225%2C300&amp;ssl=1 225w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0941.jpg?resize=768%2C1024&amp;ssl=1 768w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0941.jpg?w=1944&amp;ssl=1 1944w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0941.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0941.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 472px) 100vw, 472px\" \/><\/a><figcaption id=\"caption-attachment-211\" class=\"wp-caption-text\">The Top of the new Main Switchboard relpacing the 1940&#8217;s era electrical panel&#8211;Powerbright Electric led by Luis Munoz did the installation\/upgrade.<\/figcaption><\/figure>\n<figure id=\"attachment_212\" aria-describedby=\"caption-attachment-212\" style=\"width: 471px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0942.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-212\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0942.jpg?resize=471%2C628\" alt=\"Bottom half of the new 400 amp Load Center behind the office in Cottage A.\" width=\"471\" height=\"628\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0942.jpg?resize=225%2C300&amp;ssl=1 225w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0942.jpg?resize=768%2C1024&amp;ssl=1 768w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0942.jpg?w=1944&amp;ssl=1 1944w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0942.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_0942.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a><figcaption id=\"caption-attachment-212\" class=\"wp-caption-text\">Bottom half of the new 400 amp Load Center behind the office in Cottage A.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_220\" aria-describedby=\"caption-attachment-220\" style=\"width: 471px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/116.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-220\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/116.jpg?resize=471%2C353\" alt=\"Three new seepage pits were added in 2010 to assure the CUP Renewal--Abel Construction was the contractor who used Terra Frma Drilling as their subcontractor for drilling the deep pits themselves.\" width=\"471\" height=\"353\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/116.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/116.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/116.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/116.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a><figcaption id=\"caption-attachment-220\" class=\"wp-caption-text\">Three new seepage pits were added in 2010 to assure the CUP Renewal&#8211;Larry Abel Construction was the contractor who used Terra Firma Drilling as their subcontractor for drilling the deep pits themselves.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_213\" aria-describedby=\"caption-attachment-213\" style=\"width: 471px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_2283.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-213\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_2283.jpg?resize=471%2C353\" alt=\"Challenging installation in 2010 of a 2000 gallon septic tank to serve the Main Conference Builing and rooms and new pulic restroom, as well as Cottage B with two guest rooms.\" width=\"471\" height=\"353\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_2283.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_2283.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_2283.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/IMG_2283.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a><figcaption id=\"caption-attachment-213\" class=\"wp-caption-text\">Challenging installation in 2010 of a 2000 gallon septic tank to serve the Main Conference Builing and rooms and new pulic restroom, as well as Cottage B with two guest rooms.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>RAINS Department Store Downtown Ojai, completed 2002:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0030.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-179\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0030.jpg?resize=472%2C354\" alt=\"Two Story 1250 square foot addition to the northside of RAINS Depatment Store consisting of a second floor office and first foor expanded Men's Department, a wheel chair accessible entry and criss-crossing covered sidewalks. and new fire sprinklers through out the existing store.\" width=\"472\" height=\"354\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0030.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0030.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0030.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0030.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0030.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 472px) 100vw, 472px\" \/><\/a><\/p>\n<p>Two Story 1250 square foot addition to the north side of RAINS Department Store consisting of a second floor office and first foor expanded Men&#8217;s Department, a wheel chair accessible entry and criss-crossing covered sidewalks. and new fire sprinklers through out the existing store.<\/p>\n<figure id=\"attachment_180\" aria-describedby=\"caption-attachment-180\" style=\"width: 473px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0031.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-180\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0031.jpg?resize=473%2C355\" alt=\"Close-up of unusual double cantilvered structure to allow covered sidewalk wrapping around building.\" width=\"473\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0031.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0031.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0031.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0031.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0031.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 473px) 100vw, 473px\" \/><\/a><figcaption id=\"caption-attachment-180\" class=\"wp-caption-text\">Close-up of unusual double cantilvered structure to allow covered sidewalk wrapping around building. Steve McGillivray was the General Contractor.<\/figcaption><\/figure>\n<figure id=\"attachment_105\" aria-describedby=\"caption-attachment-105\" style=\"width: 472px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-4.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-105\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-4.jpg?resize=472%2C613\" alt=\"Aerial View of Downtown Ojai showing the RAINS Department Store Addition at the top and the Libbey Park Ticket Office lower middle\" width=\"472\" height=\"613\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-4.jpg?resize=231%2C300&amp;ssl=1 231w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-4.jpg?zoom=2&amp;resize=472%2C613 944w\" sizes=\"auto, (max-width: 472px) 100vw, 472px\" \/><\/a><figcaption id=\"caption-attachment-105\" class=\"wp-caption-text\">Aerial View of Downtown Ojai showing the RAINS Department Store Addition at the top and the Libbey Park Ticket Office lower middle.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Libbey Park Ticket Office and Kitchen, completed 1990:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1741.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-191\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1741.jpg?resize=471%2C353\" alt=\"Libbey Park Multipurpose Building (mostly the ticket office and press room for the Annual June Ojai Music  Festival and the April Ojai Tennis Tuournament).\" width=\"471\" height=\"353\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1741.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1741.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1741.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1741.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1741.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a><\/p>\n<p>Libbey Park Multipurpose Building (mostly the ticket office and press room for the Annual June Ojai Music Festival and the April Ojai Tennis Tuournament)&#8211;the client was the City of Ojai Public Works Department.<\/p>\n<p>&nbsp;<\/p>\n<p>Medical Office Building at 115 Pirie Road and Maricopa Highway, completed 1993:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0041.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-171\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0041.jpg?resize=474%2C355\" alt=\"A 9000  square foot Medical Office Building at 115 Pirie Road  and Maricopa Highway built in1993 within budget.\" width=\"474\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0041.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0041.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0041.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0041.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0041.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>A 9000 square foot Medical Office Building at 115 Pirie Road and Maricopa Highway built in1993 within budget&#8211;client was an investment group of doctors and friends a couple of whom lease office space in the building to this day .<\/p>\n<figure id=\"attachment_170\" aria-describedby=\"caption-attachment-170\" style=\"width: 476px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0045.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-170\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0045.jpg?resize=474%2C356\" alt=\"Looking Southwest towards rear of the Medical Building  that is separated into two Ells.\" width=\"474\" height=\"356\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0045.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0045.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0045.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0045.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0045.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-170\" class=\"wp-caption-text\">Looking Southwest towards rear of the Medical Building that is separated into two Ells. Gerry Peterson was the Construction Manager\/ General Contractor.<\/figcaption><\/figure>\n<figure id=\"attachment_102\" aria-describedby=\"caption-attachment-102\" style=\"width: 478px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-1.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-102\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-1.jpg?resize=474%2C616\" alt=\"An Aerial Photo courtesy of the Ventura County GIS System that shows both Ojai Valley Foursquare Church (upper middle-left and the Pirie Road Medical Building (lower middle-right).\" width=\"474\" height=\"616\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-1.jpg?resize=231%2C300&amp;ssl=1 231w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-1.jpg?zoom=2&amp;resize=478%2C621 956w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-102\" class=\"wp-caption-text\">An Aerial Photo courtesy of the Ventura County GIS System that shows both Ojai Valley Foursquare Church (upper middle-left and the Pirie Road Medical Building (lower middle-right).<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Five Unit Aartment Complex at Oak and Lions Streets, completed 1988:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0123.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-184\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0123.jpg?resize=474%2C355\" alt=\"A five unit Apartment Building at the Northwest Corner of Oak and Lion Streets in central Ojai--the original design was for natural wood siding and green roof shingles but the project was sold and the new owners insisted on white trim, blue siding , and blue roofing shingles--not the traditional &quot;craftsman&quot; style look but the Ojai City Planning Commission accepted the final color scheme.\" width=\"474\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0123.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0123.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0123.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0123.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0123.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>A five unit Apartment Building at the Northwest Corner of Oak and Lion Streets in central Ojai&#8211;the original design was for natural wood siding and green roof shingles but the project was sold and the new owners insisted on white trim, blue siding , and blue roofing shingles&#8211;not the traditional &#8220;craftsman&#8221; style look but the Ojai City Planning Commission accepted the final color scheme.<\/p>\n<figure id=\"attachment_185\" aria-describedby=\"caption-attachment-185\" style=\"width: 475px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0124.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-185\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0124.jpg?resize=474%2C355\" alt=\"Looking Southwest at the Parking and Yard areas.\" width=\"474\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0124.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0124.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0124.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0124.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/101_0124.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-185\" class=\"wp-caption-text\">Looking Southwest at the Parking and Yard areas.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Ojai Valley Foursquare Church at Cuyama and Church Roads, completed 1985:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1749.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-193\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1749.jpg?resize=474%2C355\" alt=\"The 10,000 square foot Ojai Valley Foursquare Church that featured a Main Sanctuary, Prayer Tower, Social Hall with commercial grade Kitchen, and a Classroom Wing and Central Courtyard--Treasurer Leonard Dollar and I ran the construction as de facto General Contractors (my GC license # is 437536---currently on &quot;inactive&quot; status).\" width=\"474\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1749.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1749.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1749.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1749.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1749.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>The 10,000 square foot Ojai Valley Foursquare Church that featured a Main Sanctuary, Prayer Tower, Social Hall with commercial grade Kitchen, and a Classroom Wing and Central Courtyard&#8211;Treasurer Leonard Dollar and I ran the construction as de facto General Contractors (my GC license # is 437536&#8212;currently on &#8220;inactive&#8221; status).<\/p>\n<figure id=\"attachment_194\" aria-describedby=\"caption-attachment-194\" style=\"width: 480px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1750.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-194\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1750.jpg?resize=474%2C356\" alt=\"Ojai Valley Foursquare Church, view towards the Northwest\" width=\"474\" height=\"356\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1750.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1750.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1750.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1750.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1750.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-194\" class=\"wp-caption-text\">Ojai Valley Foursquare Church, view towards the Northwest<\/figcaption><\/figure>\n<figure id=\"attachment_25\" aria-describedby=\"caption-attachment-25\" style=\"width: 475px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/cropped-4SQRoofOnStuccoOn00011.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-25\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/cropped-4SQRoofOnStuccoOn00011.jpg?resize=474%2C103\" alt=\"Looking Northeast during construction, 1983-1985.\" width=\"474\" height=\"103\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/cropped-4SQRoofOnStuccoOn00011.jpg?resize=300%2C65&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/cropped-4SQRoofOnStuccoOn00011.jpg?resize=1024%2C225&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/cropped-4SQRoofOnStuccoOn00011.jpg?w=1260&amp;ssl=1 1260w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/cropped-4SQRoofOnStuccoOn00011.jpg?w=948 948w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-25\" class=\"wp-caption-text\">Looking Northeast during construction, 1983-1985.<\/figcaption><\/figure>\n<figure id=\"attachment_1610\" aria-describedby=\"caption-attachment-1610\" style=\"width: 464px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/FOURSQUARE-Award-Dedication-1986.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-1610\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/FOURSQUARE-Award-Dedication-1986.jpg?resize=464%2C371\" alt=\"Pastor Ruby Mae Savage showed off the model shortly before my chance to speak and thank the key people.\" width=\"464\" height=\"371\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/FOURSQUARE-Award-Dedication-1986.jpg?resize=300%2C240&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/FOURSQUARE-Award-Dedication-1986.jpg?resize=1024%2C819&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/FOURSQUARE-Award-Dedication-1986.jpg?w=1700&amp;ssl=1 1700w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/FOURSQUARE-Award-Dedication-1986.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/FOURSQUARE-Award-Dedication-1986.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 464px) 100vw, 464px\" \/><\/a><figcaption id=\"caption-attachment-1610\" class=\"wp-caption-text\">Pastor Ruby Mae Savage showed off the model shortly before my chance to speak and thank the key people.<\/figcaption><\/figure>\n<figure id=\"attachment_1620\" aria-describedby=\"caption-attachment-1620\" style=\"width: 464px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJON4SQMODELlookingNORTHEAST19810001.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-1620\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJON4SQMODELlookingNORTHEAST19810001.jpg?resize=464%2C232\" alt=\"I am still searching for the orginal photo of the model because this scan was badly pixelated at 75 dpi in 2003.\" width=\"464\" height=\"232\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJON4SQMODELlookingNORTHEAST19810001.jpg?resize=300%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJON4SQMODELlookingNORTHEAST19810001.jpg?resize=1024%2C515&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJON4SQMODELlookingNORTHEAST19810001.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJON4SQMODELlookingNORTHEAST19810001.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 464px) 100vw, 464px\" \/><\/a><figcaption id=\"caption-attachment-1620\" class=\"wp-caption-text\">I am still searching for the orginal photo of the model because this scan was badly pixelated at 75 dpi in 2003&#8211;I printed it out and rescanned at a higher resolution \u00a0but that did not help so this will have to do for now.<\/figcaption><\/figure>\n<figure id=\"attachment_103\" aria-describedby=\"caption-attachment-103\" style=\"width: 477px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-2.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-103\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-2.jpg?resize=474%2C365\" alt=\"Aerial Photo howing roof design and courtyards\" width=\"474\" height=\"365\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-2.jpg?resize=300%2C231&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-2.jpg?resize=1024%2C791&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-2.jpg?zoom=2&amp;resize=477%2C367 954w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-2.jpg?zoom=3&amp;resize=477%2C367 1431w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-103\" class=\"wp-caption-text\">Aerial Photo showing roof design and courtyards<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Double J Market, Now Meiners Oaks ACE Hardware, completed 1981:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1751.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-192\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1751.jpg?resize=474%2C355\" alt=\"The 13,000 square foot Double J Market completed in 1981, Larry Loughman GeneralContractor, with Williams Refrigeration, Tony DeMaria Electric and Braker Plumbing as the principal sub--contractors--later was sold to Meiners Oaks ACE Hardware which occupies it still to this day.\" width=\"474\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1751.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1751.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1751.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1751.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/117_1751.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>The 13,000 square foot Double J Market completed in 1981, Larry Loughman General Contractor, with Williams Refrigeration, Tony DeMaria Electric, Braker Plumbing, MacPherson Plastering and Stucco, and Tempco HVAC as the principal sub-contractors (the GC did the concrete and framing)&#8211;years later was sold to Meiners Oaks ACE Hardware which occupies it still to this day.<\/p>\n<figure id=\"attachment_18\" aria-describedby=\"caption-attachment-18\" style=\"width: 474px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Double-J-Model00021-e1413983301490.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-18\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Double-J-Model00021-e1413983301490-300x62.jpg?resize=474%2C98\" alt=\"This was the 1\/8&quot; scale model I made out of illustration board to help the clients, Jim and Charlotte Gresham, and the various Ventura County agencies, see what they were gettiing.\" width=\"474\" height=\"98\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Double-J-Model00021-e1413983301490.jpg?resize=300%2C62&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Double-J-Model00021-e1413983301490.jpg?w=579&amp;ssl=1 579w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><figcaption id=\"caption-attachment-18\" class=\"wp-caption-text\">This was the 1\/8&#8243; scale model I made out of illustration board to help the clients, Jim and Charlotte Gresham, and the various Ventura County agencies, see what they were gettiing.<\/figcaption><\/figure>\n<figure id=\"attachment_1609\" aria-describedby=\"caption-attachment-1609\" style=\"width: 472px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJONdoubleJmarket19820001.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-1609\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJONdoubleJmarket19820001.jpg?resize=472%2C343\" alt=\"How Double J Market  looked a few years  after opening--creative artist Dennis Shives made the &quot;cornucopia&quot; theme sign.\" width=\"472\" height=\"343\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJONdoubleJmarket19820001.jpg?resize=300%2C218&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJONdoubleJmarket19820001.jpg?resize=1024%2C746&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJONdoubleJmarket19820001.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSITEphotosJONdoubleJmarket19820001.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 472px) 100vw, 472px\" \/><\/a><figcaption id=\"caption-attachment-1609\" class=\"wp-caption-text\">How Double J Market looked a few years after opening&#8211;creative artist Dennis Shives made the &#8220;cornucopia&#8221; theme sign.<\/figcaption><\/figure>\n<figure id=\"attachment_104\" aria-describedby=\"caption-attachment-104\" style=\"width: 473px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-3.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-104\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-3.jpg?resize=473%2C364\" alt=\"Aerial Photo via VC GIS System of project.\" width=\"473\" height=\"364\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-3.jpg?resize=300%2C231&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-3.jpg?resize=1024%2C791&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-3.jpg?zoom=2&amp;resize=473%2C364 946w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/Aerial-3.jpg?zoom=3&amp;resize=473%2C364 1419w\" sizes=\"auto, (max-width: 473px) 100vw, 473px\" \/><\/a><figcaption id=\"caption-attachment-104\" class=\"wp-caption-text\">Aerial Photo via VC GIS System of project.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>106 West Aliso Vilage Mixed Use Offices and Residence, completed 1998:<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/018.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-198\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/018.jpg?resize=471%2C353\" alt=\"A Village Mixed Use zone project\" width=\"471\" height=\"353\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/018.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/018.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/018.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/018.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a><\/p>\n<p>A Village Mixed Use zone project&#8211;I took over the project from an unlicensed drafter since commercial work requires a licensed architect, not to mention the engineering design requiring a licensed architect (or professional or \u00a0structural engineer).<\/p>\n<p>&nbsp;<\/p>\n<p>New Wheelchair Accessible restrooms for Bocalli&#8217;s Restaurant Reeves Road and Highway 150, completed\u00a02004:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0074.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-237\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0074.jpg?resize=474%2C355\" alt=\"Wheelchair accessible new restrooms for Boccali's restaurant  Reves Road and Highway 150 East Ojai Valley.\" width=\"474\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0074.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0074.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0074.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0074.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/100_0074.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>Wheelchair accessible new restrooms for Boccali&#8217;s restaurant Reeves Road and Highway 150 East Ojai Valley&#8211;Steve Lowry Construction was the General Contractor with Jeff Wells Plumbing the principal sub-contractor.<\/p>\n<p>&nbsp;<\/p>\n<p>Wood Frame Replacement of a Fire Demolished Metal Store Building at Pierpont Boulevard and Seward Avenue,Ventura, completed 2004:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/133_3380.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-234\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/133_3380.jpg?resize=473%2C355\" alt=\"Rebuild in place of a fire damaged metal building at Seward and Pierpont Boulevard in Ventura.\" width=\"473\" height=\"355\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/133_3380.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/133_3380.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/133_3380.jpg?w=2048&amp;ssl=1 2048w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/133_3380.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/133_3380.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 473px) 100vw, 473px\" \/><\/a><\/p>\n<p>Rebuild in place of a fire damaged metal building at Seward and Pierpont Boulevard in Ventura&#8211;the second smallest commercial job I have ever done (Churchill Orchards Restroom was the smallest ever).<\/p>\n<p>&nbsp;<\/p>\n<p>Carriage House in Central Ventura off South Laurel and on Poinsettia Place, completed 2014:<a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/RAEdonnieWEBBdamon46SLaurelWINDOWS409pmThursday-10-09-2014.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-225\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/RAEdonnieWEBBdamon46SLaurelWINDOWS409pmThursday-10-09-2014.jpg?resize=474%2C308\" alt=\"A 646 Square Foot &quot;Carriage House&quot; that replaced a delapidated one existing one in Central Ventura under construction as of October 26, 2014.\" width=\"474\" height=\"308\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/RAEdonnieWEBBdamon46SLaurelWINDOWS409pmThursday-10-09-2014.jpg?resize=300%2C195&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/RAEdonnieWEBBdamon46SLaurelWINDOWS409pmThursday-10-09-2014.jpg?resize=1024%2C666&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/RAEdonnieWEBBdamon46SLaurelWINDOWS409pmThursday-10-09-2014.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/RAEdonnieWEBBdamon46SLaurelWINDOWS409pmThursday-10-09-2014.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>A 646 Square Foot &#8220;Carriage House&#8221; that replaced a delapidated existing one in Central Ventura under construction as of October 26, 2014, by Damon Webb Construction.<\/p>\n<figure id=\"attachment_1580\" aria-describedby=\"caption-attachment-1580\" style=\"width: 472px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSTEphotosJONfillmoreAPARTMENTSgayleK19900001.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-1580\" src=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSTEphotosJONfillmoreAPARTMENTSgayleK19900001.jpg?resize=472%2C332\" alt=\"A 3-unit Low Cost Housing Apartment Complex in Fillmore that came through unscathed in the 1994 Northridge Quake, which damaged several older homes on rock rubble foundations in Fillmore.\" width=\"472\" height=\"332\" srcset=\"https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSTEphotosJONfillmoreAPARTMENTSgayleK19900001.jpg?resize=300%2C211&amp;ssl=1 300w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSTEphotosJONfillmoreAPARTMENTSgayleK19900001.jpg?resize=1024%2C720&amp;ssl=1 1024w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSTEphotosJONfillmoreAPARTMENTSgayleK19900001.jpg?w=948 948w, https:\/\/i0.wp.com\/jondieges.com\/wp-content\/uploads\/2014\/10\/WEBSTEphotosJONfillmoreAPARTMENTSgayleK19900001.jpg?w=1422 1422w\" sizes=\"auto, (max-width: 472px) 100vw, 472px\" \/><\/a><figcaption id=\"caption-attachment-1580\" class=\"wp-caption-text\">A 3-unit Low Cost Housing Apartment Complex in Fillmore that came through unscathed in the 1994 Northridge Earthquake, which damaged several older homes on rock rubble foundations in Fillmore.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Ojai Valley Foursquare Church completed 1984: &nbsp; Additions to Help of Ojai Senior Center &#8220;Little House&#8221; next to the Ojai City Hall, completed 1990: Front and Back Additions to the &#8220;Little House&#8221; Help of Ojai Senior Center next to the ojai City Hall&#8211;a semi-Pro-Bono effort working closely with their Building Committee&#8211;Ed paulson, Help of Ojai &hellip; <a href=\"https:\/\/jondieges.com\/?page_id=510\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Welcome to the Gallery of Architectural Work&#8211;Public Buildings&#8211;by Jon Dieges, Architect<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":3,"comment_status":"open","ping_status":"open","template":"","meta":{"nf_dc_page":"","footnotes":""},"class_list":["post-510","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/jondieges.com\/index.php?rest_route=\/wp\/v2\/pages\/510","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jondieges.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jondieges.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jondieges.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jondieges.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=510"}],"version-history":[{"count":18,"href":"https:\/\/jondieges.com\/index.php?rest_route=\/wp\/v2\/pages\/510\/revisions"}],"predecessor-version":[{"id":1706,"href":"https:\/\/jondieges.com\/index.php?rest_route=\/wp\/v2\/pages\/510\/revisions\/1706"}],"wp:attachment":[{"href":"https:\/\/jondieges.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=510"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}